全黄H全肉短篇禁乱NP慕浅浅,,,

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢(xún)電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.chinayhjt.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

木工加工棚的使用功能讓人員更

來(lái)源:http://www.chinayhjt.com/   發(fā)布時(shí)間:2022-09-02

加工棚是建筑施工過(guò)程中操作人員或人行的必經(jīng)通道,過(guò)往人員的加工棚為雙層。從懸挑腳手架的懸挑處開(kāi)始,每隔十米設(shè)置一個(gè)懸挑式加工棚,可以更好地保證加工棚下行走人員的。下面就針對(duì)木工加工棚的使用就來(lái)講講吧。
The processing shed is a necessary passage for operators or pedestrians during the construction process. The processing shed for passing personnel is double-layer. Starting from the cantilevered part of the cantilevered scaffold, a cantilevered processing shed is set every ten meters, which can better ensure the safety of people walking under the processing shed. Let's talk about the use of woodworking shed.
在施工過(guò)程中,在搭建加工棚時(shí)注意防護(hù)措施,施工人員按照施工要求進(jìn)行施工,露天攪拌機(jī)位置、現(xiàn)場(chǎng)混凝土攪拌機(jī)、卷?yè)P(yáng)機(jī)棚、鋼筋棚、木棚、部分出入口和現(xiàn)場(chǎng)廁所需要設(shè)置木工加工棚。
During the construction process, pay attention to protective measures when setting up the processing shed. The construction personnel shall carry out construction according to the construction requirements. Woodworking processing shed shall be set at the location of the open-air mixer, the site concrete mixer, the hoist shed, the steel bar shed, the wood shed, some entrances and exits and the site toilet.
水平保護(hù)安裝和拆除前,進(jìn)行技術(shù)交底。高空作業(yè)人員經(jīng)過(guò)技術(shù)培訓(xùn)和考試,并持證上崗。加工棚使用的鋼管、扣件等材料符合JGJ130-2011《建筑施工扣件式鋼管腳手架技術(shù)規(guī)范》及相關(guān)標(biāo)準(zhǔn)的要求。
Safety technical disclosure shall be conducted before installation and removal of horizontal protection. Operators working at heights shall receive professional technical training and professional examination and take up their posts with certificates. The steel pipes, fasteners and other materials used in the processing shed meet the requirements of jgj130-2011 technical code for safety of steel tubular scaffold with fasteners in building construction and relevant standards.
安裝和拆除水平加工棚時(shí),操作人員的“三寶”齊全并正確使用。加工棚搭設(shè)和拆除時(shí),應(yīng)避免上下同時(shí)作業(yè),錯(cuò)開(kāi)作業(yè)時(shí)間。安裝和拆除加工棚時(shí),所有材料和工具應(yīng)堆放在建筑物外緣少2m處,堆放高度不得超過(guò)1m。
When installing and removing the horizontal processing shed, the "three safety treasures" of the operators shall be complete and correctly used. During the erection and dismantling of the processing shed, it shall be avoided to operate up and down at the same time and stagger the operation time. When installing and removing the processing shed, all materials and tools shall be stacked at least 2m away from the outer edge of the building, and the stacking height shall not exceed 1m.
木工加工棚
建造和拆除加工棚時(shí),應(yīng)在地面上設(shè)置警戒區(qū),并派專(zhuān)人監(jiān)控。建造和拆除加工棚時(shí),應(yīng)指定專(zhuān)人指揮。管理人員應(yīng)注意眼、腿、口,采取有效的防護(hù)措施應(yīng)對(duì)危險(xiǎn)情況,確保人員。
During the construction and demolition of the processing shed, a warning area shall be set on the ground and a special person shall be assigned to monitor it. When constructing and dismantling the processing shed, a special person shall be appointed to command. The management personnel shall pay attention to the eyes, legs and mouth, take effective safety protection measures to deal with dangerous situations and ensure personnel safety.
在雨天和大風(fēng)天氣,應(yīng)暫停加工棚的搭設(shè)和拆除,并檢查和維護(hù)加工棚的質(zhì)量。加工棚搭設(shè)完成后,經(jīng)專(zhuān)職員驗(yàn)收合格后方可投入使用。在搭設(shè)和拆除水平防護(hù)前,進(jìn)行技術(shù)交底。
In rainy and windy weather, the erection and removal of processing shed shall be suspended, and the quality of processing shed shall be inspected and maintained. After the erection of the processing shed is completed, it can only be put into use after being accepted by the full-time safety officer. Before setting up and removing horizontal protection, safety technical disclosure shall be conducted.
從中我們了解到在安裝加工棚的時(shí)候一定注意施工,施工人員按照施工要求進(jìn)行施工,同時(shí)還要保證搭建質(zhì)量,這樣才能實(shí)現(xiàn)保護(hù)的作用,這樣才能達(dá)到我們搭建的目的。更多相關(guān)內(nèi)容就來(lái)我們網(wǎng)站http://www.chinayhjt.com咨詢(xún)了解吧。
From this, we learned that when installing the processing shed, we must pay attention to construction safety. The construction personnel must carry out construction according to the construction requirements, and at the same time, we must ensure the construction quality. Only in this way can we achieve the protection function and achieve our goal of building. For more information, please visit our website http://www.chinayhjt.com Consult and understand.

亚洲午夜无码久久久久| 欧美激情一区二区三区| 男朋友整根进去了但我没感觉| 亚洲爆乳无码精品aaa片蜜桃| 欧亚乱熟女一区二区在线| 日韩精品一区二区亚洲av观看| 青青草原综合久久大伊人精品| 少妇高潮抽搐无码久久av| 杨门女将之浪荡合集| 扒开老师双腿猛进入白浆小说| 亚洲精品又粗又大又爽a片| 国产成人精品无码免费播放| yy4080旧里番未删减版| av无码av天天av天天爽| 免费男女囗交视频在线观看| 在合欢椅上高潮h| 国产高清无密码一区二区三区| 荫蒂添的好舒服a片| 国产99久一区二区三区a片| 女人为啥摸几下就让进了| 被夫の上司持久侵犯耻辱在线| 免费看又黄又无码的网站| 艳妇荡女欲乱A片在线观看| 黑色包臀裙秘书啪啪久久网站 | 女性私密部位粉嫩| 嫂子的职业在线观看| 免费看又黄又无码的网站| 日本无码色情影片在线看| 无套内谢少妇毛片a片999| 再深点灬舒服灬太大了添a片v| 无码人妻一区二区三区免费n鬼沢| 做爰视频试看30分钟| 人狗大战JAVA代码| 日本边添边摸边做边爱60分钟| 年轻老师2韩国手机在线| 国产熟妇另类久久久久| 无码人妻久久一区二区三区蜜桃 | 亚洲精品久久久久中文字幕二区 | 非缘勿扰电视剧全集36免费观看| 再深点灬舒服灬太大了少妇| 亚洲午夜精品一区二区麻豆|